Cruise Ship Pile

Project Description

Trinity Products manufactured and shipped 8,000 tons of 42″OD and 60″OD spiralweld pipe piles in 3 months. The spiralweld pipe piles were used to build the foundation of the waterside construction associated with Cruise Terminal 1-Berth.

Project Details

Location: Port Canaveral, FL
Project Cost: $50,500,000