Milton-Madison Bridge

Milton-Madison Bridge Construction Video

Project Description

Trinity Products manufactured spiralweld pipe piling for the land abutments as well as the temporary bridge structure spanning across the Ohio River located in Milton KY and Madison In. Trinity also fabricated three separate barge impact frames to protect the piers during construction. For the construction of the temporary bridge, Trinity Products fabricated three pipe towers totaling 90Ft. above the normal river level to support the existing bridge.

Project Details

Fabricated False work, Towers and Impact Frames

Client: Walsh Construction
Location: Milton, Ky / Madison, IN
Project Cost: $103,000,000